 
        CB Climbing Formwork in action
- 
        Large scaffold units Large scaffold unitswith simultaneous high load assumptions through the high loading capacity of the brackets. Project: Oval Village 
- 
        Time-saving moving procedure Time-saving moving procedureof the securely assembled units consisting of platform and formwork in only one crane lift. Project: Newington 87 Causeway 
- 
        Free of tripping hazards Free of tripping hazards
 in front of and behind the formwork as the platform lining is placed over the brackets (valid for CB 240). Project: Cardiff University 
Additional information
Variations
CB 240 Climbing Formwork
Bracket width 2.40 m with carriage (75 cm retraction distance), strongback and an adjustable brace
CB 160 Climbing Formwork
Bracket width 1.60 m with adjusting unit, strongback and adjustable brace
 Interested in using CB Climbing Formwork for your project?
 Interested in using CB Climbing Formwork for your project?
       Call us on 01 588 1374 to discuss your requirements further.
 Interested in using CB Climbing Formwork for your project?
 Interested in using CB Climbing Formwork for your project?
       Call us on 01 588 1374 to discuss your requirements further.
 
              
              
             
             
             
             
             
            