Canary Wharf's first high-rise residential building

Buildings

Form structures that stand tall

From universities to residential high-rises, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

Focus Project

Building Projects

For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
VARIOKIT in place in the Station's tunnel allowing construction work to be undertaken without impeding the safety of workers
Scaffolding installation is complete, which will enhance the council-owned estate's carbon-neutral credentials.
The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
Overall view of construction site, showing cores and walls
The curved walls are constructed using the cicular wall RUNDFLEX system together with TRIO which was used to construct the different sized openings
The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours
RCS supported the spider boom platform to facilitate concrete placement on the core
1277 bespoke VARIO shutters were fabricated and delivered to the site
For these cores on the V&A Stratford project, we provided ‘up and over’ access using our PERI UP Flex scaffold so operatives could gain access from one side of the VARIO formwork shutter to the other. This was crucial as the final floor levels followed up behind the core and were not yet in place.
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Delivering a high-grade architectural finish for a world-changing university.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
CB Climbing System together with TRIO utilised to jump the cores ahead of the construction of the floors
Section of the Stafford Multi-Storey pre-cast car park with PROKIT edge protection
One of the three blocks, construction from one floor to the next, each floor measuring 1,400m2 took only eight days
Steel reinforcement ties the core together
South Quay Plaza
Greenwich Peninsula
Delivering an architectural concrete finish for a 19th century building.
The Link, City Road
Scaffolding used on Payne Road.
Product: DUO Formwork
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase. (Photo: IABG)
VARIO GT24 Girder formwork being used to construct the 15m high walls. This system is able to withstand high load bearing due to the girder system
Each MULTIPROP has an integrated tape measure which can be pre-set before erection saving time-consuming measuring and re-adjustments
The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes
A timber gridshell shapes the undulating roof and gives the distillery its unique geometry
Aberdeen Western Peripheral Route/Balmedie to Tipperty (AWPR/ B-T)
Infrastructure formwork for a driverless rail link service.
Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
The drum formwork was integrated with heavy-duty trusses comprising RCS rail frames and heavy-duty rollers to facilitate movement.
The Tideway project will redirect sewage overspill from the most polluting overflow points via purpose-built shafts along the River Thames.
One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.
The efficient PERI UP system is quick and easy to erect, and it provided safe access to the site.
PERI’s SKS single-sided climbing system, complete with a mixture of RUNDFLEX and TRIO shutters was used to form the concrete liner.
Rolls Royce, Derby
The Werrington Grade Separation scheme will make way for a new diveunder railway line.
Efficient formwork and falsework for one of Scotland’s busiest roads.
Working platforms and integrated access provides safety at height for construction workers using the PERI UP Rosett Flex Modular Scaffolding System
Meeting formwork demands on Hinkley Point C
Custom-made cleats realised the unique shape of the piers.
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
Combination of two climbing systems used as ACS required to raise all platforms simultaneously. ACS system pre-fabricated at the Rugby Depot due to site space constrictions
RCS climbing protection panel ensures workers' safety and completely encloses the construction area
One Park Drive, Wood Wharf
Brunel Building, North Wharf Road
PERI UP Easy provides access on Blake Tower
Bold designs and extraordinary architectural concrete fulfilled. In addition, the utmost accuracy was required for the subsequent glazing work
The close mesh panels provide a safe and secure enclosure whilst still allowing light to penetrate
Spectacular view of the City of London from One Tower Bridge
Project-specific formwork ascends on MECD’s irregular-shaped cores.
Bespoke formwork delivers unique architectural concrete requirements.
Concrete House, Sussex