Residential Complex at North Station Vienna, Austria
Vienna,
Austria
Two residential buildings each with 8 storeys, with a total of 91 housing units on the area of the former North Station in Vienna
Walls, columns and slabs constructed using in-situ concreting operations
Universale Hochbau, Trumau
Location
Main Application
Housing and Multi-Storey Buildings
-
BenefitsArchitectural concrete walls with clearly arranged joint and tie pattern
-
BenefitsCompliance with the tight construction schedule
-
BenefitsVery manageable on-site material requirements
The Project
Impressions from the project process
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
On the area that was formerly Vienna´s North Station, 91 housing units are currently being developed in two eight-storey residential buildings.
The one-sided tie installation procedure of the MAXIMO panel formwork reduced shuttering times as well as ensuring that a neat joint and tie arrangement was achieved.
The SKYDECK construction with lightweight main beams and panels provides a systematic assembly sequence and creates space under the formwork.
The PERI solution with MULTIFLEX and MULTIPROP for forming the circumferential balconies simultaneously functioned as the work scaffold.
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
On the area that was formerly Vienna´s North Station, 91 housing units are currently being developed in two eight-storey residential buildings.
The one-sided tie installation procedure of the MAXIMO panel formwork reduced shuttering times as well as ensuring that a neat joint and tie arrangement was achieved.
The SKYDECK construction with lightweight main beams and panels provides a systematic assembly sequence and creates space under the formwork.
The PERI solution with MULTIFLEX and MULTIPROP for forming the circumferential balconies simultaneously functioned as the work scaffold.
Project Information
Jürgen Pischof
Site Manager
With SKYDECK, we have exactly the right slab formwork system for our construction project – the drophead for early striking as well as the simple and easy handling have really convinced us. And the MAXIMO wall formwork is 25 per cent faster than conventional panel formwork systems; the one-sided anchoring in particular saves a great deal of time.