Motorway Bridge D1, Slovakia
Považská Bystrica,
Slovakia
The “Centrum” motorway junction as a 767-metre-long bridge structure
Construction period: 2008 - 2010
Bögl a Krýsl, k.s, Prešov
Location
Main Application
Civil Engineering
-
Benefitscost-effective construction using rentable system components from the VARIOKIT system
-
Benefitstransfer of vertical and horizontal loads from a height of over 15 m
-
Benefitsbundling of standards for concentrated load points using PERI UP Flex falsework
The Project
Impressions from the project process
The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
The PERI UP supporting structure could be optimally adapted to suit the geometry of the structure due to the modular assembly and metric grid dimensions.
Raised formwork units made of standardized system components taken from the VARIOKIT engineering construction kit form the external web formwork and cantilever formwork.
The supporting level of the PERI UP falsework construction was almost 15 m.
The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
The PERI UP supporting structure could be optimally adapted to suit the geometry of the structure due to the modular assembly and metric grid dimensions.
Raised formwork units made of standardized system components taken from the VARIOKIT engineering construction kit form the external web formwork and cantilever formwork.
The supporting level of the PERI UP falsework construction was almost 15 m.
Project Information
Ľuboš Šalváry
Site Manager
We have been working together with PERI for many years now, and once again we have not been disappointed. For each bridge section, we received the right formwork and scaffolding solution.