Location: Inverness, United Kingdom
15,963sqm floor space
MULTIPROP Tables adapted to different lengths from 62.5cm to 2.96m, to allow perfect adjustment to each individual job as site required
To be clad in reconstituted concrete in a dark tone creating a plinth that the upper floors will sit upon.
At the entrances on the north and south elevation, this same material will be used to form the entrance canopies.
Ease of movement between floors.
Morrison Construction Ltd
"This large-scale project meant that the equipment on site has had to be easy to assemble, adjust and move across different levels. PERI has been able to supply equipment that is reliable, durable, but also lighweight. Health & Safety has been maintained and allowed us to ensure the security of the personnel working on site."
MULTIPROP with the GY24 Girder to form Tables with PD8 Trolley to ensure ease of movement.
Tables moved using sling and C Hook product.