Benefitsreduced labour costs thanks to accelerated construction process
-
Benefitscompliance with high safety requirements
The Project
Impressions from the project process
Project Information
![Konrad Szopa, Site Manager South Section, Statement](https://cdn.peri.cloud/.imaging/lPortrait/dam/640ead6b-b25c-4b4f-8153-fb6262925c8c/9328/konrad-szopa-site-manager-south-section.jpg)
![Konrad Szopa, Site Manager South Section Konrad Szopa, Site Manager South Section, Statement](https://cdn.peri.cloud/.imaging/lPortrait/dam/640ead6b-b25c-4b4f-8153-fb6262925c8c/9328/konrad-szopa-site-manager-south-section.jpg)
Konrad Szopa
Site Manager South Section
With such a large-scale project, having a competent formwork partner is extremely important. The co-operation with PERI ensured adherence to the strictest safety requirements and, at the same time, reduced the labour costs.
Are you working on a project like this?
Call us on 01 588 1374 to discuss your requirements further.
![Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.](https://cdn.peri.cloud/.imaging/mWide/dam/15276ba7-7ef2-47a7-a066-ecf29b921e7f/9342/czajka-sewage-plant-only-two-years-of-construction-time.jpg)
![Czajka Sewage Plant - only two years of construction time Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.](https://cdn.peri.cloud/.imaging/mWide/dam/15276ba7-7ef2-47a7-a066-ecf29b921e7f/9342/czajka-sewage-plant-only-two-years-of-construction-time.jpg)