ADAC Headquarters, Gemany
Munich,
Germany
Five-storey, undulating curved base construction and office tower with 23 floors.
Overall height: 91 m
Construction period: 2006-2011
ARGE Neubau ADAC-Zentrale:
Ed. Züblin AG, Direktion Nord und Bayern;
ADAC, München
Location
Main Application
Housing and Multi-Storey Buildings
The Project
Impressions from the project process
The RCS climbing protection panel provides a complete enclosure of the upper floors thus providing protection against wind and weather – this leads to an increase in productivity.
For fast and safe forming of the curved floor slabs, rentable modular and trapezoidal-shaped customised tables with integrated guardrails are used.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
Below the shear walls, HD 200 heavy-duty props transfer linear loads of up to 400 kN/m and ideally supplement the MULTIPROP temporary props.
The undulating curved base structure is positioned on an up to 6.50 m thick bottom plate and covers an area of 17,000 m².
The 93 m high multi-storey building cantilevers by around 7 m in the direction of the railway line. Over a length of 50 m, an 18 m high PERI UP shoring serves to carry the loads.
The new ADAC headquarters is comprised of a five-storey, undulating curved base structure with a large courtyard. The office tower continues upwards for another 18 floors.
The RCS climbing protection panel provides a complete enclosure of the upper floors thus providing protection against wind and weather – this leads to an increase in productivity.
For fast and safe forming of the curved floor slabs, rentable modular and trapezoidal-shaped customised tables with integrated guardrails are used.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
Below the shear walls, HD 200 heavy-duty props transfer linear loads of up to 400 kN/m and ideally supplement the MULTIPROP temporary props.
The undulating curved base structure is positioned on an up to 6.50 m thick bottom plate and covers an area of 17,000 m².
The 93 m high multi-storey building cantilevers by around 7 m in the direction of the railway line. Over a length of 50 m, an 18 m high PERI UP shoring serves to carry the loads.
The new ADAC headquarters is comprised of a five-storey, undulating curved base structure with a large courtyard. The office tower continues upwards for another 18 floors.
Project Information
Joachim Link
Site Manager Multi-Storey Structure
For this project, we received a clear and well prepared formwork and scaffolding concept from PERI. In addition, the punctual and site-compliant service provided by the PERI engineers greatly contributed to the cost-effective and time-saving project development.