Internal view of resevoir walls. Neat high concrete finish of walls. Personnel show shear height of resevoir walls

Project Overview

Together with our customers we create great things. Whether scaffolding, skyscrapers, bridges or tunnels, we will show you which projects we have realized together with our customers.

All Projects

Infrastructure formwork for a driverless rail link service.
One of the three blocks, construction from one floor to the next, each floor measuring 1,400m2 took only eight days
RCS supported the spider boom platform to facilitate concrete placement on the core
Efficient formwork and falsework for one of Scotland’s busiest roads.
The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
A timber gridshell shapes the undulating roof and gives the distillery its unique geometry
The curved walls are constructed using the cicular wall RUNDFLEX system together with TRIO which was used to construct the different sized openings
RCS climbing protection panel ensures workers' safety and completely encloses the construction area
The temporary works provided support to the 14.50m 2-floor element and pvodided a matrix of steel-deck working platforms enabling safe access and close monitoring during massive concrete pours
Bold designs and extraordinary architectural concrete fulfilled. In addition, the utmost accuracy was required for the subsequent glazing work
The close mesh panels provide a safe and secure enclosure whilst still allowing light to penetrate
Spectacular view of the City of London from One Tower Bridge
Internal view of resevoir walls. Neat high concrete finish of walls. Personnel show shear height of resevoir walls
Steel reinforcement ties the core together
Project-specific formwork ascends on MECD’s irregular-shaped cores.
The efficient PERI UP system is quick and easy to erect, and it provided safe access to the site.
PERI’s SKS single-sided climbing system, complete with a mixture of RUNDFLEX and TRIO shutters was used to form the concrete liner.
PERI UP Modular System Scaffolding was used for the external scaffold around the three digester tanks.
Working platforms and integrated access provides safety at height for construction workers using the PERI UP Rosett Flex Modular Scaffolding System
Meeting formwork demands on Hinkley Point C
Bespoke formwork delivers unique architectural concrete requirements.
1277 bespoke VARIO shutters were fabricated and delivered to the site
One Park Drive, Wood Wharf
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
Concrete House, Sussex
The A52 Clifton Bridge, a major National Highways upgrade project in Nottingham, is a complex structure, which required repairs inside and underneath the bridge to strengthen the concrete.
Combination of two climbing systems used as ACS required to raise all platforms simultaneously. ACS system pre-fabricated at the Rugby Depot due to site space constrictions
The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes
The drum formwork was integrated with heavy-duty trusses comprising RCS rail frames and heavy-duty rollers to facilitate movement.
The Tideway project will redirect sewage overspill from the most polluting overflow points via purpose-built shafts along the River Thames.
South Quay Plaza
Brunel Building, North Wharf Road
Delivering an architectural concrete finish for a 19th century building.
VARIO GT24 Girder formwork being used to construct the 15m high walls. This system is able to withstand high load bearing due to the girder system
Delivering a high-grade architectural finish for a world-changing university.
Rolls Royce, Derby
For these cores on the V&A Stratford project, we provided ‘up and over’ access using our PERI UP Flex scaffold so operatives could gain access from one side of the VARIO formwork shutter to the other. This was crucial as the final floor levels followed up behind the core and were not yet in place.
CB Climbing System together with TRIO utilised to jump the cores ahead of the construction of the floors
Each MULTIPROP has an integrated tape measure which can be pre-set before erection saving time-consuming measuring and re-adjustments
Greenwich Peninsula
One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.
The Werrington Grade Separation scheme will make way for a new diveunder railway line.
Custom-made cleats realised the unique shape of the piers.
VARIOKIT in place in the Station's tunnel allowing construction work to be undertaken without impeding the safety of workers
Aberdeen Western Peripheral Route/Balmedie to Tipperty (AWPR/ B-T)
View of the underside of the VK-P Parapet system, cantilevered literally over the banks of Loch Lomond
Section of the Stafford Multi-Storey pre-cast car park with PROKIT edge protection
Overall view of construction site, showing cores and walls
The Link, City Road
PERI UP Easy provides access on Blake Tower
Scaffolding installation is complete, which will enhance the council-owned estate's carbon-neutral credentials.
Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets. The horizontal loads are transferred via friction, anchoring is not required.
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method. For the construction of the motorway bridge near Tarnow, the construction crew achieved a 4 to 5-day cycle thanks to the easy to use, mechanical solution. At the same time, the high requirements concerning the very small tolerances for the variable bridge cross-sections could be fulfilled.
The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
Bermondsey Drive Under
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase. (Photo: IABG)
The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
Scaffolding used on Payne Road.
Product: DUO Formwork
In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interested in how PERI can support your next project?

Call us on 01 588 1374 to discuss your requirements further.

Contact us