The Aquatics Centre

Project data

Location: London, United Kingdom

The building faced the Olympic Stadium and was used for all the swimming and diving events. The building stands 45m high and has a footprint of 160m x 80m

Requirements

Extremely high architectural concrete finish

The end walls curved both horizontally and vertically whilst changing thicknesses

Designed and built to millimetre accuracy in 3D

Architect: Zaha Hadid

Customer

A.J. Morrisroe & Sons Ltd

Customer's benefit

Each bespoke precisely dimensioned formwork units simplified on-site assembly

 

Tony Henry
Senior Project Manager

"PERI was able to provide a high level of expertise and knowledge throughout the project."

PERI solution

200 customized 3D formwork units to be erected on site