Project data

Location: Belfast, United Kingdom

A cantilever deck of  30,000m² floor deck slab  with concrete-to-floor slabs volume of approx. 8,000m³.  

400mm thick RC slab with an additional grid of 2.40m x 2.50m concrete beams on top

Requirements

Two building elements - the main building and the cantilever extension

Climbing system to enable large areas of walls to be constructed in advance of the main floor levels following below

Fair faced finish required for columns

Customer

M&L Contracts

Customer's benefit

Overal cost-effective

The SKYDECK system coped superbly with the demands of volume, speed and efficiency required for the project

Michael Lynch
Project Director

"PERI provided a total project solution and delivered excellent quality design."

PERI solution

A variety of systems was used for speed of construction, mobility and handling on upper floors

PERI UP falsework to support the cantilever building

SKYDECK to floor construction -