Location: Belfast, United Kingdom
A cantilever deck of 30,000m² floor deck slab with concrete-to-floor slabs volume of approx. 8,000m³.
400mm thick RC slab with an additional grid of 2.40m x 2.50m concrete beams on top
Two building elements - the main building and the cantilever extension
Climbing system to enable large areas of walls to be constructed in advance of the main floor levels following below
Fair faced finish required for columns
M&L Contracts
"PERI provided a total project solution and delivered excellent quality design."
A variety of systems was used for speed of construction, mobility and handling on upper floors
PERI UP falsework to support the cantilever building
SKYDECK to floor construction -