Haribo Production Facility

Project data

Location: Castleford, United Kingdom

30,700 sqm of space

Large 74m2 tables 

To construct shear walls, in-situ stairs and suspended slabs

Slab pour sizes averaged 1047m² with a concrete volume of 523m³.

Architect: The Harris Partnership

Requirements

Tight construction schedule

Construction of main production facility,  the office block and kitchen

To provide a safe, fast and efficient soffit system large enough to produce quick cycle times and keep the use of cranes to a minimum

High quality finish

Customer

Northfield Construction Ltd

Customer's benefit

Maximum sized table utilised to keep in line with the site crane lifting capabilities

The large 74m2 tables kept materials to a minimum, thus utilising maximum efficiency

Table system made a profound difference on the overall programme

On-going technical advice identified possible design issues and minimal revisions

Paul McGarry
Construction Manager

“PERI’s technical office has been terrific from the very offset and has provided continuous dialogue and regular site visits during the length of the project. This helped identify possible design problems and eliminate any issues later on, meaning that minimal revisions were required when it came to using the equipment on site."

PERI solution

PERI designed a lightweight MULTIPROP table system

Tailored castor to support weight of bespoke table system

VARIO wall formwork for architectural concrete finish

MULTIPROP falsework to support high level soffits