Location: Castleford, United Kingdom
30,700 sqm of space
Large 74m2 tables
To construct shear walls, in-situ stairs and suspended slabs
Slab pour sizes averaged 1047m² with a concrete volume of 523m³.
Architect: The Harris Partnership
Tight construction schedule
Construction of main production facility, the office block and kitchen
To provide a safe, fast and efficient soffit system large enough to produce quick cycle times and keep the use of cranes to a minimum
High quality finish
Northfield Construction Ltd
“PERI’s technical office has been terrific from the very offset and has provided continuous dialogue and regular site visits during the length of the project. This helped identify possible design problems and eliminate any issues later on, meaning that minimal revisions were required when it came to using the equipment on site."
PERI designed a lightweight MULTIPROP table system
Tailored castor to support weight of bespoke table system
VARIO wall formwork for architectural concrete finish
MULTIPROP falsework to support high level soffits
Climbing system to create spacious but safe working environment