Location: Plymouth, United Kingdom
Opencast pit with dimensions of 800m long x 400 wide x 260m deep
Capacity to produce approximately 3,500 tonnes of tungsten and 500 tonnes of tin per year
15m high walls in places
High concrete finish required
Construction of crusher house and concrete columns for the feed bin vaults
Construction of the slab included the height and depth of the slab to be poured.
STAM Construction Ltd
Mick Taylor from STAM Construction, said: “The Drakelands Mine project has been a challenging project to have been involved with. When we were awarded the contract we contacted PERI to provide us with their advice to ensure the project would run smoothly and we have been very pleased with the service their team have provided us through this rewarding journey.”
MULTIPROP used for the construction of the challenging slab
VARIO GT 24 Girder system to form 15m high walls
VARIO System used to construct columns